About SGA | Contact SGA | Event Calendar | Links | Members | Resource Center | Training Resources | Home

 

Members

Non-Members

SGA Web Conference

- safely managing the life cycle of pipelines

Transmission Integrity Management Programs (TIMP)

- the challenges of implementation

Session 3: After the ILI Report

Download the slides (PDF, 1 slide per page, color)

Play the WebEx recording of the session

Click on the links of the presentations below to play the Flash version of that presentation.

Monday, May 19, 2008  9:30 AM to 11:30 AM CT

After receiving the final report from an ILI vendor the pipeline operator must determine: which anomalies require immediate investigation; which anomalies should be repaired; estimate growth of remaining defects; determine re-inspection interval; remaining life etc.

This session explored the range of post-report activities that should be considered by pipeline operators and discussed what benefits will accrue.

The Web Conference Session

This session included the following presentations:

Repair/Remedial Strategies
Martin R. Phillips, Senior Engineer - Pipeline Integrity, CC Technologies/DNV

Managing SCC and other crack-like defects

Marc Lamontagne, Principal, LPAC

After the ILI: Reliability Based Integrity Management Program

Albert van Roodselaar, Senior Reliability Engineer, Chevron Energy Technology Company